Okapi Logistics Okapi Logistics

CE and ISO9001 Certified Prefabricated Steel Structure for Industrial Projects

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Specifications
Model NO.
AH001
Type
Stereoscopic Warehouse
Engineering
Design, Detailing, Optimization, Erection
Building Codes
GB, CE
Certificate
CE, ISO9001
Steel Consumption
20-40 Kg Per Square Meter
Enclosure System
Single-Corrugated Panel
Production Time
4-8 Weeks
Color
Green, Gray, Yellow, Red, White
Life Span
50 Years
Origin
China
HS Code
7308900000
Steel Structure Banner
Product Description

PREMIUM STEEL STRUCTURE WAREHOUSE

Our steel structure warehouse and workshop buildings offer the perfect combination of durability, efficiency, and cost-effectiveness for industrial and commercial applications. Engineered with high-strength Q235B/Q355B steel, these prefabricated metal buildings deliver exceptional structural stability while maintaining a lightweight design.

Ideal for manufacturing plants, distribution centers, logistics warehouses, and industrial workshops, our steel structure solutions feature rapid construction timelines, flexible large-span layouts, and superior seismic resistance.

Warehouse View 1
Warehouse View 2
Warehouse View 3
Steel Structure 1
Steel Structure 2
Steel Structure 3
Technical Specification
EngineeringDesign, Detailing, Optimization, Erection
Building CodesGB, CE
CertificateCE, ISO9001
Steel Consumptic30-45 Kg Per Square Meter
Enclosure SystemSingle-Corrugated Panel, Sandwich Panel
UsageIndustrial Building
Area25000m2
Steel ColumnBox Column
GradeQ355, Q235
Surface TreatmentShot Blasting & 2 Layer of Anti-Rust Paint
BeamH Sectional Beam
SpanMulti Span
Column Distance8m

COST-EFFECTIVE & ECONOMICALLY PRACTICAL

From initial investment to long-term operation, steel structure warehouses deliver outstanding value. Lower material costs, reduced foundation expenses, minimal maintenance requirements, and faster construction translate into significant cost savings.

Cost Effective Solution
Sustainable Material

SUSTAINABLE & FULLY RECYCLABLE MATERIALS

Constructed from eco-friendly steel that is 100% recyclable, our buildings minimize environmental impact. The clean construction process generates minimal waste, supporting corporate sustainability goals.

FLEXIBLE LAYOUT DESIGN

Column-free interior spaces of up to 30+ meters enable maximum space utilization. The modular design allows easy future expansion, internal reconfiguration, and customization to meet evolving operational needs.

Flexible Layout
Easy Installation

SIMPLE MAINTENANCE & EASY INSTALLATION

Pre-engineered components with bolt connections simplify both installation and future maintenance. The anti-corrosion-treated steel requires minimal upkeep, reducing downtime and maintenance expenses.

Manufacturing & Quality Control
Production Line 1
Production Line 2
Project Case
Frequently Asked Questions
Q1: What materials are primarily used in your steel structures?
We utilize high-strength Q235 and Q355 grade steel for all critical structural elements. These materials are available in both welded and hot-rolled variants to ensure maximum load-bearing capacity and structural integrity.
Q2: Do you provide technical support for installation?
Yes, we offer comprehensive technical support including pre-installation consulting, load analysis, and connection design. We can also provide on-site installation guidance to ensure safety and compliance with standards.
Q3: How long is the expected service life of these buildings?
With high-quality materials and proper anti-corrosion treatments like shot blasting and multiple layers of paint or galvanization, our steel structure buildings are designed for a service life of over 50 years.
Q4: Are the structures environmentally sustainable?
Absolutely. Steel is 100% recyclable. Our manufacturing process minimizes waste, and the long lifespan reduces the carbon footprint over the building's lifecycle compared to traditional construction.
Q5: Can the warehouse design be customized?
Yes, the modular design allows for highly flexible layouts. We can accommodate column-free spans of up to 30+ meters and tailor the dimensions, colors, and enclosure systems to meet your specific industrial needs.
Q6: What is the typical production timeline for a project?
The standard production time ranges from 4 to 8 weeks, depending on the complexity and scale of the design. Pre-engineering allows for much faster construction than traditional building methods.

Related Products