Okapi Logistics
For buildings exceeding 7 floors, the main steel frame utilizes double H section steel or box steel. We weld male pins onto the steel members to ensure a superior connection with concrete, effectively saving steel tonnage and concrete costs. Steel decking is a critical material for flooring, allowing for multi-floor installation simultaneously, a significant advantage over traditional concrete buildings.



Multi-floor high-rise steel structure buildings (hotels, offices, malls) are designed for specific live and dead loads. Flooring is composed of steel beams, purlins, steel decks, and concrete. Staircases feature H-section columns and checker steel plates. This prefabricated system ensures fast installation and environmental sustainability.


1. Sand Blast: High-grade 2.5 effect meets strict international standards.
2. Welding: Experienced professionals specializing in butt, fillet, and intermittent welding for orderly and nice welding lines.
3. Painting: Uniform thickness and proportion through high-pressure airless spraying technology.
4. Logistics: Optimized packing using closed containers with steel skids to save shipping costs and protect surface quality.